ESA title
Under construction: Malargüe station.
Enabling & Support

Malargüe tracking station powered up

30/11/2011 959 views 3 likes
ESA / Enabling & Support / Operations

On 29 November, the power plant at ESA's new 35m deep space station in Malargüe was connected to the public power network. The key construction milestone was overseen by the Governor of Argentina's Mendoza Province and the Mayor of Malargüe. A power line was specially deployed to the DSA3 site by the same local company that built the power plant to the highest quality standards. Connecting power was one of the last major milestones before lifting the huge 35 m-diameter antenna onto the station support, set for early in December.

Related Links

Related Links