ESA title
Play
$video.data_map.short_description.content
Applications

About the launch

11254 views 11 likes
ESA / Applications / Observing the Earth / Copernicus / Sentinel-2

Sentinel-2A was launched on 23 June 2015 on a Vega rocket from Europe’s spaceport near Kourou in French Guiana. Sentinel-2B followed from the same site on 7 March 2017. Sentinel-2C joined the family in orbit on 5 September 2024 on the last Vega rocket.

Named after the second brightest star in the northern hemisphere, the European Vega is a single-body rocket with three solid-propellant stages and a liquid-propellant upper module for attitude and orbit control, and satellite release.

With a height of 30 m and diameter of 3 m, the launcher can place 300–1500 kg satellites, into the polar and low-Earth orbits used for many scientific and Earth observation missions.

Costs are kept to a minimum by using advanced low-cost technologies and by introducing an optimised synergy with existing production facilities used for Ariane launchers.

Development of the launcher started in 1998. The first Vega lifted off on 13 February 2012 on a flawless qualification flight from Europe’s Spaceport, where the Ariane 1 launch facilities have been adapted for its use.

Closing Sentinel-2B fairing
Closing Sentinel-2B fairing

The Vega launch site is located at the previous ELA-1 complex, originally used for the now retired Ariane 1 and Ariane 3 missions.

The pad and infrastructure have been adapted to meet Vega’s requirements. It retains the original flame ducts, which channel Vega’s exhaust gases during ignition and liftoff. A new fixed umbilical mast provides power and environmental control connections to the launcher and its payloads from mission preparation to the final countdown and liftoff.

Launcher preparation takes place on the pad inside a mobile gantry that houses all the support equipment to assemble and check the vehicle. The gantry provides a protected environment for launch personnel. Its height is 50 m and weighs more than 1000 t.

The Operational Control Centre for Vega is in the Launch Control Centre built for Ariane 5. It houses Vega’s operational and monitoring systems.

Vega payloads benefit from Ariane 5’s state-of-the-art facilities. The payload preparation buildings accommodate satellite and control equipment unpacking, mechanical assembly work, electrical and mechanical inspections, and checkout of the various platform and payload subsystems.

Final integration of the payload composite takes place at the complex before its transfer to the launch pad for hoisting onto the top of the launcher.

Vega with Sentinel-2C gantry roll back
Vega with Sentinel-2C gantry roll back

The launch site at Kourou lies at latitude 5°3', just over 500 km north of the equator.

Being near the equator makes the site well-suited for launches into geostationary orbit because few changes have to be made to a satellite’s trajectory. Launchers also profit from the ‘slingshot’ effect – the energy created by the speed of Earth’s rotation around the axis of the poles. This increases the speed of a launcher by 460 m/s. These important factors save propellant and money, and prolong the active life of satellites.

Thanks to its geographical position, Kourou offers a launch angle of 102° from east to north, enabling a wide range of missions.

Safety is equally important. French Guiana is sparsely populated and 90% of the country is covered by equatorial forests. In addition, there is no risk of cyclones or earthquakes.

After launch, the European Commission assumes ownership of the Sentinel-2 satellites.

Back to Sentinel-2 homepage

Related Links