An Ariane 5G, atop its mobile launch platform, leaves the 90-m-tall Final Assembly Building (BAF), where its was mated with its payloads, for a 2.8-km transfer to the Launch Zone (ZL-3) of the Ariane Launch Complex no.3 (ELA-3) at the Guiana Space Centre, Europe's Spaceport, on 25 February 2004