Support Structures for satellites’ appendages:
“Ultra-Light Structures”
Objectives: Demonstrate the feasibility of manufacturing, folding, deploying and rigidizing large pneumatic satellite two-dimensional appendage supporting structures by developing the relevant technology.
Programme: TRP
Contractor: Astrium-ST
Status: Expected completion (2007/Q4)
“Polymerisation of Composite Structures in Free-Space Conditions”
Objectives: Develop the polymerisation process of composite structural materials in space environment
Programme: TRP
Contractor: Astrium-ST
Status: Expected completion (2007/Q1)
Landing:
“Exomars Phase B1”
Objectives: Design, breadboard and tests of both vented and non-vented airbags for performance comparison.
Programme: EXOMARS
Contractor: Aerosekur
Status: Expected completion (2007/Q2)
Actuators:
“Capture/Docking Mechanism Testing”
Objectives: Follow-on development of a MSR Inflatable Capture Mechanism (ICM). Testing in relevant environment intends to demonstrate the capability of the ICM to capture the SC and transfer it into the Orbiter.
Programme: Aurora
Contractor: Alcatel-Alenia Space Italy
Status: Expected completion (2008/Q1)
Habitats:
“SpaceHaven Inflatable Habitat Study”
Objectives: Requirements definition and preliminary design of Inflatable Habitat for future Human Exploration missions. Breadboard activities for selected capabilities.
Programme: STEP
Contractor: Alcatel-Alenia Space Italy
Status: Expected completion (2007/Q1)
“Design, Verification and Manufacturing aspects relevant for Inflatable Modules”
Objectives: Analyse and test technologies, specific design aspects relevant for inflatable modules.
Programme: TRP
Contractor: Alcatel-Alenia Space Italy
Status: Expected completion (2007/Q4)
Last update: 23 May 2007 |