Created as part of the DUE FAME (Flood Risk and Damage Assessment using Modelling and Earth Observation techniques) project, this diagram shows how model results compare with the reality of the flood on the river Demeter in January 1995. It is an overlay of an ERS SAR-derived flood map for 30 January 1995 (in yellow), with the existing Flemish map of peak floods for 1995 (in red) the MIKE 11 hydraulic flood simulation results for 30 January 1995 (in brown) and the MIKE 11 hydraulic flood simulation results at the peak moment (in blue).