Satmex 6 being hoisted in the Final Assembly Building Encapsulation Hall, ready for mating with the Sylda 5 payload dispenser: 15 May 2006.
Once the satellite is mounted on the payload dispenser, the complete assembly will be covered with the launcher fairing.