The upper composite in the launch tower at the Plesetsk Cosmodrome on 27 October. The upper composite, which comprises the SMOS and Proba-2 satellites mated to the Breeze-KM upper stage and encapsulated in the fairing, is first hoisted to the top of the tower and onto the lower stages of the Rockot launcher.