Preparing to launch the next two Galileo IOV satellites on 12 October 2012. On 8 October the Upper Composite - the twin satellites, their supporting dispenser and Fregat-MT upper stage enclosed within a protective launch fairing - was moved to the launch site, for vertical mating to its three-stage Soyuz ST-B rocket.