ESA uses cookies to track visits to our website only, no personal information is collected.
By continuing to use the site you are agreeing to our use of cookies. OK
Find out more about our cookie policy.
    • → European Space Agency

    • ESA Web TV

    • Videos on demand

    • Videos for professionals

    • Next Transmissions

    ESA > Television > 2023 > 06 > Biomass rocks and rolls
    Login | Register

    Search and order online

      • Filter (Broadcast quality)
        • All
        • Videos: any
        • Videos: online
        • Videos: tape
        • Transmissions
        • Broadcast quality
    • Advanced Search

    Biomass rocks and rolls

    • Watch in:
    • en
    Download MP4 (17.25 MB)
    Source MP4 (806.24 MB)

    Details

    Open/Close
    • Video Online only
    • Title Biomass rocks and rolls
    • Released: 09/06/2023
    • Length 00:02:20
    • Language English
    • Footage Type Animation
    • Copyright ESA/ATG medialab
    • Description

      Biomass orbits our planet in a Sun-synchronous dawn-dusk orbit at altitude of 666 km. The satellite’s left-looking synthetic aperture radar covers a single fifty- to sixty-kilometre-wide swath at a time.

      After 44 orbits in a three-day period, the Biomass satellite repeatedly observes the same area, but with a small longitudinal displacement to produce the stack of images needed for forest data products. Each stack comprises seven images for tomographic coverage and comprises three images for interferometric coverage.

      Following the completion of an image stack with the single swath, the Biomass satellite carries out a ‘mechanical roll’ manoeuvre close to the North Pole. This ensures the next observations are adjacent to the area previously measured. Upon completion of the third swath, one major cycle is completed.

      Over the following 9–12 days, Biomass then performs a repositioning manoeuvre so that its instrument can start measuring the adjacent strip. This repositioning manoeuvre is achieved by raising the satellite’s orbit, drifting for a certain period, and then returning to its normal 666 km orbital height. At this point, the acquisition pattern described earlier is repeated until a total of seven of these major cycles have been completed and a global coverage has been reached.

      While the animation shows how global coverage builds up in a generic sense, the Biomass mission actually commences with a single tomographic global coverage phase to reveal the structure of the forest which takes about 18 months. This is then followed by multiple nine-month interferometric global coverages for the remainder of the mission’s life to understand how forests change over time.

      Access the related broadcast quality video material.

    TAGS

    Open/Close
    • Activity Observing the Earth
    • Mission Biomass
    • System Future EO
    • Keywords Animations, Vegetation monitoring

    TAGS

    Open/Close

    Details

    Open/Close

    Clips

    Open/Close

    No broadcast quality clips available

    Clips

    Open/Close

    ESA TV NOTIFICATIONS

    ALL TRANSMISSIONS

    VIDEO DISTRIBUTION

    USEFUL LINKS

    EUROVISION WorldLink

    Europe by Satellite

    Euronews Space

    NASA Television

    Roscosmos TV

    Arianespace News

    Hubble Telescope

    USING OUR VIDEOS

    Terms and Conditions

    Help

    Contact us

    • Connect with us
    • Subscribe
    • FAQ

    • Contacts

    • Terms and conditions

    • Privacy notice

    • Careers at ESA

    • Subscribe