ESA title
Applications

GOCE launch diary gallery

ESA / Applications / Observing the Earth / FutureEO / GOCE

Complementing the GOCE launch diary, this image gallery provides a glimpse into the range of activities that are being carried out to prepare the satellite for launch. The photos show the satellite being shipped from ESA's facilities in the Netherlands to the Plesetsk Cosmodrome in northern Russia, the campaign in the autumn of 2008 and activities gearing up for launch on 17 March 2009. The most recent pictures feature first.

Related Links

GOCE in ESA's test facilities
Applications

Entry 1: GOCE prepares for shipment to Russia

1027 views 0 likes
Read
GOCE
Applications

Entry 2: GOCE begins its journey to launch site

1263 views 0 likes
Read
Safe arrival for GOCE at Arkhangelsk
Applications

Entry 3: GOCE arrives safely at launch site in Russia

1010 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 4: GOCE unpacked and alignment check complete

781 views 0 likes
Read
Into container to check for gas leaks
Applications

Entry 5: GOCE checked for gas leaks

827 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 6: Launch team reaches full strength

639 views 0 likes
Read
Roll out of Upper Composite
Applications

Entry 7: Gradiometer checked and launcher rolled out for te…

634 views 0 likes
Read
GOCE joining Breeze
Applications

Entry 8: GOCE satellite joins Breeze

581 views 0 likes
Read
Last look at GOCE
Applications

Entry 9: Last-ever look at GOCE

644 views 0 likes
Read
GOCE on the launch pad
Applications

Entry 10: GOCE on the launch pad

761 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 11: Launch of GOCE delayed

613 views 0 likes
Read
GOCE before joining the adaptor
Applications

Entry 12: Satellite activities resume 24 September

622 views 0 likes
Read
Fairing with logos
Applications

Entry 13: GOCE team gearing up for new launch date

548 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 14: GOCE launch postponed

507 views 0 likes
Read
GOCE in Plesetsk
Applications

Entry 15: March launch planned for GOCE

468 views 0 likes
Read
GOCE container
Applications

Entry 16: Team make ready to wake up GOCE

545 views 0 likes
Read
Applications

Entry 17: GOCE revealed as container opened

571 views 0 likes
Read
Activating the ion propulsion valves
Applications

Entry 18: A busy week

802 views 0 likes
Read
GOCE mated to the Breeze Upper Stage
Applications

Entry 19: GOCE meets launcher Upper Stage

563 views 0 likes
Read
Last inspection before fairing closes
Applications

Entry 20: Encapsulation

552 views 0 likes
Read
Transfer of GOCE to launch tower
Applications

Entry 21: On the launch pad

839 views 0 likes
Read
ESA and industrial team members during GOCE countdown rehearsal, Plesetsk, 13 March 2009
Applications

Entry 22: Launch rehearsed

548 views 0 likes
Read
GOCE liftoff
Applications

Entry 23: GOCE launched and in orbit

1546 views 3 likes
Read
Cleanroom used for storage
Applications

Entry 24: Going home

890 views 1 likes
Read
Plesetsk Cosmodrome
Agency

Plesetsk

8247 views 5 likes
Read