ESTEC Test Centre engineers examine the Galileo Full Operational Capability satellite after it has been slid out of the Phenix test chamber on 29 November 2013, following a five-week thermal–vacuum test. The box within the Phenix is the ‘thermal tent’, used to reproduce the extreme temperatures of space.