Part 8: 5 - 9 December
Monday 5 December
The pyro arming has been performed following the visual inspection after the finalization of filling operation.
Tuesday 6 December
Spacecraft preparation for the wet weighing operation, classed as a hazardous operation.
Wednesday 7 December
The spacecraft weighing after filling has been performed successfully. The spacecraft mass in launch configuration is 2034.4 kg (fully conforming to predictions).
![Preparations for transport to BAF](/var/esa/storage/images/esa_multimedia/images/2005/12/msg-2_installation_on_the_payload_transport_container/10036773-2-eng-GB/MSG-2_installation_on_the_payload_transport_container_article.jpg)
In order to release MSG-2 for transport from the S5-A Building to Final Assembly Building (BAF) the Launch Readiness Review (LRR) has been held. The conclusion is that MSG-2 is ready to be transported and integrated on the Launcher.
Thursday 8 December
Following the Check-out Terminal Equipment (COTE) transport in the Launch table, the links validation has started with the S5-C building.
Friday 9 December
In order to transport the spacecraft on the launcher in the BAF the acceptance of this facility has been carried out.